Transmission lines; relocation and undergrounding.

Requires that any transmission line of 230 kilovolts or less that is proposed to connect to a proposed new substation that has received local final development plan approval be placed underground if (i) such line would extend from an existing substation that will be powered by a transmission line of 230 kilovolts or less, (ii) such line received a certificate of public convenience and necessity from the Commission to be placed underground prior to December 31, 2018; (iii) the portion of such line between the existing substation and the proposed new substation is not more than 4,500 linear feet; and (iv) the total cost of undergrounding the proposed relocated transmission line does not exceed $40 million. The bill requires that existing overhead transmission lines that meet such criteria be replaced and relocated with a new underground transmission line and that the location of the new underground transmission line be consistent with the comprehensive plan and the economic development priorities of the governing body of the locality in which the new underground transmission line is to be placed. The bill has an expiration date of December 31, 2021.

Date Version PDF TXT
01/08/2020 Senate: Prefiled and ordered printed; offered 01/08/20 20102022D Open

            

2020 SESSION

    20102022D
    SENATE BILL NO. 784
    Offered January 8, 2020
    Prefiled January 8, 2020
    A BILL to amend the Code of Virginia by adding a section numbered 56-585.1:11, relating to transmission lines; relocation and undergrounding.
    ----------
    Patron-- Saslaw
    ----------
    Referred to Committee on Commerce and Labor
    ----------

    Be it enacted by the General Assembly of Virginia:

    1. That the Code of Virginia is amended by adding a section numbered 56-585.1:11 as follows:

    56-585.1:11. Transmission lines; relocation and undergrounding.

    A. Any proposed relocation of a transmission line of 230 kilovolts or less that will connect to a proposed new substation that has received local final development plan approval shall be placed underground if (i) such line would extend from an existing substation that will be powered by a transmission line of 230 kilovolts or less, (ii) such line received a certificate of public convenience and necessity from the Commission to be placed underground prior to December 31, 2018; (iii) the portion of such line between the existing substation and the proposed new substation is not more than 4,500 linear feet; and (iv) the total cost of undergrounding the proposed relocated transmission line does not exceed $40 million.

    B. Existing overhead transmission lines that meet the criteria in clauses (i) through (iv) of subsection A shall be replaced and relocated with a new underground transmission line. The location of the new underground transmission line shall be consistent with the comprehensive plan and the economic development priorities of the governing body of the locality in which the new underground transmission line is to be placed.

    2. That the provisions of this act shall expire on December 31, 2021.

    3. That any transmission line that meets the criteria established in clauses (i) through (iv) of subsection A of � 56-585.1:11 of the Code of Virginia, as created by this act, prior to December 31, 2021, shall be relocated and placed underground in accordance with this act.

    Picture Name From Date Type
    Richard L. Saslaw D-Richmond Sponsor
    Date Branch Action
    01/10/2020 Senate Senate: Assigned C&L sub: Energy
    01/08/2020 Senate Senate: Prefiled and ordered printed; offered 01/08/20 20102022D
    01/08/2020 Senate Senate: Referred to Committee on Commerce and Labor
    Summary
    Congress - Bill Number Major Title
    Branch Vote Date Yes No Not Voting
    Wiki
    Date Bill Major Title
    Committee Name
    Subject Type