Introduced in House Passed House Introduced in Senate Passed Senate Became Law
01/07/2020        

Electric utility regulation; pilot program for undergrounding electrical transmission lines.

Provides that the State Corporation Commission's approval of a proposed transmission line for inclusion in a pilot program established as part of the Grid Transformation and Security Act enacted in 2018 (i) precludes the placement of future overhead electrical transmission lines of at least 69 kilovolts in the same area or corridor by other transmission projects and (ii) does not preclude the placement of electrical distribution lines in the same area or corridor. The pilot program provides for the underground construction of two electrical transmission lines, including one for the Haymarket transmission line project in Prince William County.

Date Version PDF TXT
01/28/2020 House: Committee substitute printed 20106440D-H1 Open
01/07/2020 House: Prefiled and ordered printed; offered 01/08/20 20101252D Open

            

2020 SESSION

    20106440D
    HOUSE BILL NO. 1030
    AMENDMENT IN THE NATURE OF A SUBSTITUTE
    (Proposed by the House Committee on Labor and Commerce
    on January 28, 2020)
    (Patron Prior to Substitute--Delegate Roem)
    A BILL to amend and reenact � 8 of the second enactment of Chapter 296 of the Acts of Assembly of 2018, relating to electrical transmission lines.

    Be it enacted by the General Assembly of Virginia:

    1. That � 8 of the second enactment of Chapter 296 of the Acts of Assembly of 2018 is amended and reenacted as follows:

    � 8. The provisions of this enactment shall not be construed to limit the ability of the State Corporation Commission to approve additional applications for placement of transmission lines underground. Approval by the State Corporation Commission of a transmission line for inclusion in the program pursuant to � 2 of the second enactment of this act shall preclude the placement of future overhead electrical transmission lines of at least 69 kilovolts in the same right-of-way as described in � 2 of this act for a period of 10 years from the effective date of this act but shall not preclude the placement of (i) any underground transmission lines in such right-of-way or (ii) any electrical distribution lines in such right-of-way.

    Picture Name From Date Type
    Danica A. Roem D-Richmond Sponsor
    Clinton L. Jenkins D-Richmond Cosponsor
    Date Branch Action
    01/28/2020 House House: Committee substitute printed 20106440D-H1
    01/28/2020 House House: Reported from Labor and Commerce with substitute (13-Y 9-N)
    01/23/2020 House House: Subcommittee recommends reporting with substitute (6-Y 4-N)
    01/16/2020 House House: Assigned L & C sub: Subcommittee #3
    01/07/2020 House House: Prefiled and ordered printed; offered 01/08/20 20101252D
    01/07/2020 House House: Referred to Committee on Labor and Commerce
    Summary
    Congress - Bill Number Major Title
    Branch Vote Date Yes No Not Voting
    House 1/28/2020 12:00:00 AM 13 9 0
    House 1/16/2020 12:00:00 AM 6 4 0